Have you had a look at Indonesian Project (thermal coal) - notice the CAPEX.
"The study has confirmed that the Berau Project has the potential to generate an annual operating surplus of approximately US$33m, with:
• total capital cost of approximately US$19m;
• average operating costs of approximately US$41 per tonne;
• a projected coal price of approximately US$52/tonne, FOB ship (current prices are approximately US$55-57/tonne);
• 3 Mt peak production per year;
• a run of mine coal product of medium calorific value of 5,400-5,600 kcal/kg GAR with low sulphur - 0.66%, as received (AR); ash - 7.3%, AR and total moisture - 16.6%, AR; and
• a development timetable of 8 months from receipt of development approvals to production."
11/06/09.
- Forums
- ASX - By Stock
- monkey buy at 57.5/58
Have you had a look at Indonesian Project (thermal coal) -...
-
-
- There are more pages in this discussion • 40 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add SRK (ASX) to my watchlist
(20min delay)
|
|||||
Last
3.1¢ |
Change
0.000(0.00%) |
Mkt cap ! $9.931M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 100268 | 3.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
3.3¢ | 76808 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 12987 | 0.077 |
1 | 50000 | 0.075 |
1 | 250000 | 0.072 |
1 | 100000 | 0.071 |
1 | 50000 | 0.070 |
Price($) | Vol. | No. |
---|---|---|
0.080 | 19545 | 1 |
0.083 | 1300 | 1 |
0.084 | 90000 | 1 |
0.086 | 47000 | 1 |
0.088 | 10000 | 1 |
Last trade - 07.00am 18/11/2024 (20 minute delay) ? |
Featured News
SRK (ASX) Chart |
Day chart unavailable
The Watchlist
ACW
ACTINOGEN MEDICAL LIMITED
Will Souter, CFO
Will Souter
CFO
Previous Video
Next Video
SPONSORED BY The Market Online