MLS 0.00% 2.6¢ metals australia ltd

They want to do Phase 3 during the summer season, but we haven't...

  1. 420 Posts.
    lightbulb Created with Sketch. 5
    They want to do Phase 3 during the summer season, but we haven't even started the 8 week Phase 2 program yet and we are heading into Spring...

    "In addition, Metals Australia received all the permits required to progress with its follow-on explorationprograms at Lac Rainy, including the planned drilling program to commence during 2019.The planned drilling program comprises of diamond drilling to test the grade and down-dip continuity ofthe mineralisation in priority areas identified by the channel sampling.Magnor Exploration Inc. (Magnor) has been appointed to oversee the Phase II exploration campaignsand will provide all levels of geological and technical assistance in the field over the duration of theprograms."

    "The drilling program will be completed with one drill rig with the entire program expected to take up to 8weeks to complete. The program will include 1 week of site preparation works including access tracks,drill pads and equipment mobilisation followed by 4 weeks of drilling and 2 weeks of sample preparation,site rehabilitation and equipment demobilisation. An additional week is for any contingency relatedmatters.Depending on the outcome of this initial diamond drilling program, the Company plans to undertake anexpanded drilling program of between 4,000 metres and 6,000 metres of diamond drilling during thesummer field season in Quebec.The maiden diamond drilling program, as well as subsequent programs, will be supported withouthelicopters, using the ground access installed during the Phase I campaign."
 
watchlist Created with Sketch. Add MLS (ASX) to my watchlist
(20min delay)
Last
2.6¢
Change
0.000(0.00%)
Mkt cap ! $17.45M
Open High Low Value Volume
2.5¢ 2.6¢ 2.5¢ $18.31K 707.6K

Buyers (Bids)

No. Vol. Price($)
1 3934 2.5¢
 

Sellers (Offers)

Price($) Vol. No.
2.7¢ 109960 2
View Market Depth
Last trade - 15.50pm 22/11/2024 (20 minute delay) ?
MLS (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.