Thanks JL, cost is $40 million for, as Porka points out, a 20% reduction in fuel costs. Sure there was a grant of $20m plus debt funding from CEFC of $15m, but is this project commercially viable, I think not.
Maybe in 50 years when the technology is advanced to the stage where you don't need a 20 hectare solar farm with 34,000 solar panels on it. ARENA and CEFC can only fund a very limited number of projects like this, and my guess is there isn't too many listed company boards with an appetite to spend $40 million on a power saving project like this.
Imagine the savings Sandfire could get if they also bolted an ATEN unit onto the existing diesel generators they're still using!!
So.....has the boat sailed on ATEN? I think not!
- Forums
- ASX - By Stock
- Missed the boat?
Thanks JL, cost is $40 million for, as Porka points out, a 20%...
-
- There are more pages in this discussion • 38 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add VPR (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.2¢ |
Change
0.001(100%) |
Mkt cap ! $21.43M |
Open | High | Low | Value | Volume |
0.2¢ | 0.2¢ | 0.2¢ | $5.554K | 3.649M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
30 | 67407509 | 0.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.2¢ | 88429408 | 51 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
7 | 14782371 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.002 | 121281796 | 28 |
0.003 | 87438382 | 17 |
0.004 | 14496209 | 10 |
0.005 | 5020669 | 4 |
0.006 | 1073331 | 2 |
Last trade - 12.28pm 04/12/2024 (20 minute delay) ? |
Featured News
VPR (ASX) Chart |