Column 1 0 Stellar Resources Production at todays prices Current TIN prices Operating Profit $42.7M aud
Column 1 0 Pre Capital Start Up Costs $114m us - Underground Mining Methods to process 600,000/t ore for recovery of approx 5,000/t tin concentrates pa.
At Current LME Tin Price (29 Oct 16) $us20,850
Production Costs 5000/t @$us 14,438/t = $us72,190,000
Sales 5000t @ $us20,850 p/t = $us104,250,000
Gross profit $us32,060,000 Converted to $au42,717,000
Futures Tin Price Say $us30,000 p/t equates to $au102,397,093 Gross profit
Futures TIN prices @ $us30,000/t = Operating Profit $102.4M aud
About 1 month ago this formula would have resulted in a negative result and
after Fridays TIN price resurgence there is now a big possibility that an operations start
up could be looked at especially if TIN reaches $us 30,000 p/t.
Just need to fast track the steps and find a backer with a spare 100 mill.
- Forums
- ASX - By Stock
- SRZ
- METALS-Tin hits 22-month peak
METALS-Tin hits 22-month peak
-
-
- There are more pages in this discussion • 131 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add SRZ (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.6¢ |
Change
-0.001(5.88%) |
Mkt cap ! $34.31M |
Open | High | Low | Value | Volume |
1.6¢ | 1.6¢ | 1.5¢ | $37.72K | 2.414M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
6 | 2812544 | 1.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.6¢ | 143828 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 315511 | 0.013 |
2 | 450769 | 0.012 |
3 | 650000 | 0.011 |
7 | 1743003 | 0.010 |
1 | 400000 | 0.009 |
Price($) | Vol. | No. |
---|---|---|
0.015 | 217473 | 1 |
0.016 | 321296 | 1 |
0.017 | 15000 | 1 |
0.018 | 830995 | 3 |
0.019 | 150000 | 1 |
Last trade - 15.32pm 18/11/2024 (20 minute delay) ? |
Featured News
SRZ (ASX) Chart |