Mega Factories State of Play 2017-2021
Assuming a very conservative 250 GWh by 2021 that translates to :
Spherical Graphite annual demand (1kg per KWh assumption) : 250.000tpa
(at 50% yield of spheronization that is 500.000tpa of flake graphite)
Lithium annual demand (0.65kg per KWh assumption) : 162.500tpa
Cobalt annual demand (0.1kg per KWh assumption) : 25.000tpa
Simon Moores @sdmoores 13 oct.
20 lithium ion battery megafactories in the pipeline. As tracked by @benchmarkmin the leaders in battery supply chain Intel
- Forums
- Commodities
- Mega Factories State of Play 2017-2021
Mega Factories State of Play 2017-2021 Assuming a very...
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)