Their prospectus said to drill Willaroo-1 + shoot 2D seismic was $2.3m and to drill Nyngynderry-1 + 2D seismic was forecast to be $3.5m.
I'm thinking the costs look reasonable because it's onshore and quite shallow, but someone like pc43 is a much better authority on this sort of thing