well...i doubt Banpu (who acquired HUN) are interested in exploration drilling so they may possibly farm out the ex-HUN ground to ROB
HUN were set to start drilling as the takeover occurred
Banpu took over HUN for the JORCed & production ready deposits
HUN had a 70% equity position in Zun Gol & AR Zun Gol and exploration target of 150mt to 250mt tonnes (with old reports having yield of about 50% on limited samples)
however, it could cost ROB 400m to 500m shares (who knows)
issuing 500m shares to Banpu would make the market cap $26m after the reconstuction (less $3.3m in options cash and less $3m in cash raised)
so the EV is $20m chasing say 120mt of recoverable coal
EV = 17 cents per tonne
key is the coal quality
regards
ROB Price at posting:
1.9¢ Sentiment: None Disclosure: Not Held