GWR is already shipping big time via a proxy entity, but not informing the market or the regulators...food for thought...just check out the production timelines they have been announcing in annual reports from 05, 06, 07, 08, 09, 10 (long long long long time hey?) - they have raised all the money they needed, as planned, and drilled the bejesus out of C3 and C4, as planned, and that's why they have been producing and selling on the side.
If you don't believe it, then ask yourself, what they have been doing since the mid-2000s with all those drilling results and all that money?
Cheers and happy Easter
K
- Forums
- ASX - By Stock
- market cap
GWR is already shipping big time via a proxy entity, but not...
-
- There are more pages in this discussion • 6 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add GWR (ASX) to my watchlist
(20min delay)
|
|||||
Last
8.3¢ |
Change
-0.002(2.35%) |
Mkt cap ! $26.33M |
Open | High | Low | Value | Volume |
8.5¢ | 8.5¢ | 8.3¢ | $16.21K | 191.0K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 135790 | 8.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
8.5¢ | 17143 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 2216 | 0.100 |
1 | 40000 | 0.099 |
1 | 10000 | 0.098 |
1 | 7402 | 0.074 |
1 | 300000 | 0.035 |
Price($) | Vol. | No. |
---|---|---|
0.110 | 60000 | 1 |
0.115 | 20000 | 1 |
0.120 | 6795 | 1 |
0.130 | 33334 | 1 |
0.140 | 16000 | 1 |
Last trade - 15.20pm 22/11/2024 (20 minute delay) ? |
Featured News
GWR (ASX) Chart |
The Watchlist
ACW
ACTINOGEN MEDICAL LIMITED
Andy Udell, CCO
Andy Udell
CCO
SPONSORED BY The Market Online