FEASIBILITY STUDY COMPLETED CONFIRMING ROBUST CASH MARGINS.
Feasibility Study completed on a 2 million tonne per annum iron sand mine for the Jogjakarta Iron Project.
? Strong projected cash margins and low capital cost per annual tonne of production ? US$24.20 per tonne operating cost (FOB) for 55% Fe concentrate ? US$158.3 million capital cost ? Project IRR 44.5% (before tax) ? 163.5 million tonnes Probable Mining Reserve (surface sands) @ 13.7% Fe ? Final Project approvals well advanced ? Mining operations targeted to commence within 18 months.
At spot iron ore pricing and foreign exchange rates, the Project has an IRR of 83.1% (before tax).