GPP 0.00% 0.1¢ greenpower energy limited

It's all about calculation of timing if you read the anns....

  1. 4,285 Posts.
    lightbulb Created with Sketch. 718
    It's all about calculation of timing if you read the anns. carefully.

    It was said on the anns on 20th of April that a drill core sample pulp prepared in Georgetown would be shipped to Nagrom Laboratories in Perth. It was a week ago. They said today that it was shipped to Georgetown.

    It was also said on the same anns that the drill hole TD-001 was completed on Wednesday 18th April. It was completed in 4 days. Now it's 8 days after the first hole completed. It was obvious that 2nd hole was finished in 4 days at least (as it would be shorter -140m said before) and 3rd hole should have been started.

    Also it was said on 23rd anns that Drill Hole TD 002 commenced and expected to be completed overnight (on 24th).

    That means 3rd hole would be started on 25th (yesterday) at least. Also the 3rd hole is being drilled from the same drill pad as shown on the Drill plan. They would only need to turn the direction of the drill rig as said on today's anns.

    You need to look at the drill plan carefully to understand what's going on.

    I can tell you that most probably the 3rd hole will be finished on Friday or Saturday and 4th hole will be started very soon.
 
watchlist Created with Sketch. Add GPP (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.