What i would be expecting is that they could drill 1 hole per week, so I would be hoping that they will be sending drill cores after every two to three holes drilled, which means first assay results end May. I know they have indicated 15 to 20 holes, but would prefer 10 - 15 holes, drilled deeper. I recognise the assumption here is a shallow deposit, but I expect some weathering at near surface so the results to look at are probably from 40 metres down IMO. (Even AVZ had a lot of weathering at near surface to illustrate.)
Finally, in terms of the Ann of yesterday "Praise the Lord for GPP have found a will to drill after so many lunches". All IMO
GPP Price at posting:
1.5¢ Sentiment: None Disclosure: Held