andiver1964 .we don't need props now just a good grade .which from the report seems more than likely and over the long length,, then there is a very good chance of a repeat just across the valley at Irak ,the near vertical structures of 300m diameter are the hallmark elsewhere that are sort after in this type of deposite ! The good thing is that will be understood in 3 weeks ,I was puzzled why we drilled the bridge area first , although from what I have learnt about 3d-IP assessments is that drilling the shoulders seems to be the accepted proceedure. The next lot seem to be aimed into the heart of targets now. In patience Cheers G
QRL Price at posting:
23.8¢ Sentiment: Buy Disclosure: Held