The Eastern side is 5,000 to 8,000m long, untested section is 600m to 850m wide and the thickness of an eastern most hole is 56m @ 59%Fe.
If its flat lying and thickness continues it could be anywhere between an additional 50Mt to 150Mt on the Eastern side ON TOP of the initial resource target of 100Mt to 140Mt for the Western Side.
Incidentally the range extends over the road down to the south-west with further iron formations evident on sat pics. Wouldnt expect much from this side however.
260km by existing road to Port Hedland.
That extension of the 'Green Zone' at McPhee creek
GIR Price at posting:
$2.07 Sentiment: LT Buy Disclosure: Held