Hi clf
I have missed something in the reports re drilling finished and waiting for results. I agree that as the initial hole was 400m it should be finished by now but can't seem to find anything to confirm the drilling has concluded.
Wait to see if any Director flies to NS in the near future, that would be a good sign.
kippax