-
Share
12,407 Posts.
85
27/02/11
10:55
Share
current price/T@ 62% is $190
however, for worst case scenario:
projected minimum LT price/T @ 62%Fe $90
projected maximum cost/T $50
minimum margin/T $40
minimum production rate 1.5mTpa
= $60m pa profit before tax
also worth noting current EV/T on the West Pit alone now stands at 23c. add the other 88mT global resource and it drops down to 10c/T
this compares favourably with our closest peer, IFE, at around 50c/T, and way below the current average of 90c/T.
(peer figures can be sourced here
http://www.fostock.com.au/talkingpoint/FMS110121.pdf)
-