APC 0.00% 0.1¢ australian potash limited

Timing was dependent on drilling and fit out of the 3rd and 4th...

  1. 1,616 Posts.
    lightbulb Created with Sketch. 190
    Timing was dependent on drilling and fit out of the 3rd and 4th test wells. They allowed 35-45 days to complete all testing which makes results due next week or the following. Hope they had no issues and finished early allowing release of results at the AGM.
 
watchlist Created with Sketch. Add APC (ASX) to my watchlist
(20min delay)
Last
0.1¢
Change
0.000(0.00%)
Mkt cap ! $4.070M
Open High Low Value Volume
0.1¢ 0.1¢ 0.1¢ $1.12K 1.12M
APC (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.