"A development option is currently being pursued which includes the possibility of utilising the existing slurry pipeline from the Century zinc mine in Queensland to Port Karumba on the coast.
The Highland Plains deposit is only 68km to the west of Century which is currently preparing for the end of open cut zinc production in approximately 2016."