http://www.juniorminingnetwork.com/...-estimate-for-sal-de-los-angeles-project.html
VANCOUVER, Aug. 30, 2016
The resource estimate also established an inferred resource of 189,130 tonnes of lithium at 410 mg/l (1,007,000 tonnes of LCE) and 2,068,161 tonnes of potassium at 4,489 mg/l (3,948,000 tonnes KCl equivalent).
The resource estimate establishes Sal de los Angeles as a large and high grade undeveloped lithium brine project, with a Feasibility Study underway.
- Forums
- Commodities
- Lithium from Brine
http://www.juniorminingnetwork.com/junior-miner-news/press-releas...
-
- There are more pages in this discussion • 2 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)