one possibility is to use the ABV brake on only one axle and use it as the first brake to come on in a progressive braking system that still employs standard brakes on the rest of a road train axles .
That way the the ABV brake would take on a greater % of the total road train braking for when light braking occurs and the wear would be disproportionatly lower overall and therefore the payback on the ABS brake would be faster.
Maybe if it was the first brake to come on in a progressive system and installed on the last axle of a road train the driver could then also use it to prevent fish tailing.
- Forums
- ASX - By Stock
- ABV
- Linfox and ABV
Linfox and ABV, page-5
-
- There are more pages in this discussion • 48 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ABV (ASX) to my watchlist
(20min delay)
|
|||||
Last
8.8¢ |
Change
-0.001(1.12%) |
Mkt cap ! $28.70M |
Open | High | Low | Value | Volume |
9.0¢ | 9.0¢ | 8.8¢ | $21.89K | 244.4K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 8791 | 8.8¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
8.9¢ | 100000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 131787 | 0.012 |
1 | 100000 | 0.010 |
1 | 700561 | 0.009 |
2 | 10000000 | 0.001 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.014 | 371498 | 2 |
0.015 | 528000 | 2 |
0.016 | 119374 | 2 |
0.017 | 687500 | 3 |
0.019 | 575000 | 1 |
Last trade - 16.10pm 25/11/2024 (20 minute delay) ? |
Featured News
ABV (ASX) Chart |
The Watchlist
ACW
ACTINOGEN MEDICAL LIMITED
Andy Udell, CCO
Andy Udell
CCO
SPONSORED BY The Market Online