Things like logistics centres, commercial sites etc sound great. But as soon as you go that direction there is much more established competition in the space.
Spectur's slight point of difference is having a fully self contained (solar/battery/comms) solution. This edge isn't there for fixed installations in the same way.
Someone can correct me, but the thermal technology is likely a third party camera/sensor/lens built into the existing spectur integrated system (hardware, comms and monitoring) so in that regard I can't see a specific, unique, licensing option.
- Forums
- ASX - By Stock
- Licensing opportunities
Things like logistics centres, commercial sites etc sound great....
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add SP3 (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.7¢ |
Change
-0.001(5.56%) |
Mkt cap ! $4.942M |
Open | High | Low | Value | Volume |
1.7¢ | 1.7¢ | 1.7¢ | $3.486K | 205.0K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 45460 | 1.7¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.9¢ | 649122 | 4 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 260900 | 0.017 |
4 | 1222190 | 0.016 |
1 | 20000 | 0.013 |
1 | 50000 | 0.010 |
2 | 200000 | 0.005 |
Price($) | Vol. | No. |
---|---|---|
0.018 | 100000 | 1 |
0.019 | 162000 | 1 |
0.021 | 203398 | 1 |
0.022 | 109551 | 1 |
0.023 | 700000 | 1 |
Last trade - 12.33pm 27/11/2024 (20 minute delay) ? |
SP3 (ASX) Chart |