Yep, sure sign that nothing happens in the wet, you can see the road is impassable at this time of the year.Seriously, the footings and pylons are the most time consuming aspect, a month of waiting until the concrete has cured and obtained full strength then its hoist the beams which should be sitting in a holding yard on site, remember we saw the footage of the first beam being trucked from Darwin a few months ago. I would also imagine there is some roadworks in place either side of the bridge that would be part of the full sealing of the roadway as announced.
- Forums
- ASX - By Stock
- Legume Road/Keep River Crossing
Yep, sure sign that nothing happens in the wet, you can see the...
-
- There are more pages in this discussion • 57 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add SFG (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.2¢ |
Change
0.000(0.00%) |
Mkt cap ! $12.09M |
Open | High | Low | Value | Volume |
0.2¢ | 0.2¢ | 0.2¢ | $4.02K | 2.010M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
49 | 123677116 | 0.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.2¢ | 1534779 | 9 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
32 | 27078633 | 0.002 |
18 | 66035026 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.003 | 16396720 | 14 |
0.004 | 2824792 | 10 |
0.005 | 1795951 | 10 |
0.006 | 1118347 | 5 |
0.007 | 200000 | 1 |
Last trade - 10.11am 02/12/2024 (20 minute delay) ? |
Featured News
SFG (ASX) Chart |