For those watching progress this project, without scepticism. A secure crossing of Keep River/Legume Road has been past highlighted as one key measure for project development. The 2018 dry season was heralded as time for these road-works to occur. On or about the 20th May 2018 Sentinel 'bird in the sky' shows road work site est. west side @ Legume Road/Keep River Crossing. Over the dry period and to 9th December 2018, road works would now appear to have connected much of this key river crossing. Obviously on-ground info would be handy but in its absence 'bird in the sky' gives some indication I would suggest/imo. As project continues to further unfold, 'sky view' should continue to show progress this great project, road-works, ponds etc. Whilst resolution is not particularly high quality, is sufficient for inductions of marks on the ground, as seen from Sat. above. c further Sentinel-hub playground FYI.
- Forums
- ASX - By Stock
- Legume Road/Keep River Crossing
For those watching progress this project, without scepticism. A...
-
-
- There are more pages in this discussion • 72 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add SFG (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.2¢ |
Change
0.000(0.00%) |
Mkt cap ! $12.09M |
Open | High | Low | Value | Volume |
0.2¢ | 0.2¢ | 0.2¢ | $4.02K | 2.010M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
49 | 123677116 | 0.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.2¢ | 1534779 | 9 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
32 | 27078633 | 0.002 |
18 | 66035026 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.003 | 16396720 | 14 |
0.004 | 2824792 | 10 |
0.005 | 1795951 | 10 |
0.006 | 1118347 | 5 |
0.007 | 200000 | 1 |
Last trade - 10.11am 02/12/2024 (20 minute delay) ? |
Featured News
SFG (ASX) Chart |