At last they have found the stacked U system that they have been looking for looks like it is open to the N and S. Things are definitely looking up for NGM with step out drilling under way. Now they needs some more big intersections above 1000ppm. Personally, I think they should drop a hole down to 100m to see if it is open at depth also.
Looks like the target of 80m lbs U308 will be hit.