From Jammy-D
They've drilled to 10506ft, pulled out of well, tested blow out preventor on 08/02/11, logged the well, ran 11-7/8 casing to 10506 ft and cemented with 2405 sacks. Tested blow out preventor on 12/02/11 and re-comenced drilling to 10514 ft.
No issues reported so all good. Slowly, slowly as long as no issues then all good.
JD