Yes, report also mention this could be the location for a starter pit requiring minimal development costs.
Would be tempting to start pulling ore out to feed the mill once the haul road is complete and I suppose that is an option should they need to.
But what I am looking forward to is the initial resource estimate.
"In the 1st of February 2019 announcement, Troy suggested that Ohio Creek might encompass a series of mineralised sections which are thus not continuous, and hence development might well involve a series of pits rather than one large pit.
Whilst that might well remain the situation, it is in turn noted that a continuous mineralised section to the north-west at Ohio Creek is now of a length of approximately 500 metres and open to the north-west, meaning that individual pits might nevertheless potentially be of substantial size."
Still a lot of infill drilling to do as well as testing the extensions N/E and S/W, also TRC089 had 3 g/t oz at the bottom of the hole so still open at depth
- Forums
- ASX - By Stock
- TRY
- Latest oustanding drill results
Latest oustanding drill results, page-4
-
- There are more pages in this discussion • 15 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add TRY (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
ACW
ACTINOGEN MEDICAL LIMITED
Andy Udell, CCO
Andy Udell
CCO
SPONSORED BY The Market Online