. . ok not quite surface - but I guess they might be trenching in an previously worked area which is already some metres below ground level - on the table I see it says from 35m.
Still, a great target in the overall OC picture, to capture earlier yields from the prospective pit as it heads down to harvest some of those other strong hits we've seen from earlier drill results . . .