Exploration Office Ground Level 11A Croydon Road KESWICK SA 5035 Tel: +61 8 8351 3388 Fax: +61 8 8375 3999 InterMet Resources Limited [email protected] [email protected] ACN 112 291 960 www.intermetresources.com.au Registered Office Level 41 Australia Square 264-278 George Street SYDNEY NSW 2000 Tel: +61 2 8221 0404 Fax: +61 2 8221 0407 Monday, 18 December 2006 LAKE GILLES DRILLING UPDATE InterMet Resources Limited (InterMet) (ASX:ITT) is pleased to announce the completion of the first drill hole at its Lake Gilles Project on northeastern Eyre Peninsula. Hole RDDD2 was completed to a depth of 481 metres. The core is currently being cut and sampled. Laboratory analyses are expected at the end of January 2007. Several samples are also being dispatched for petrological description. Hole RD-DD2 was drilled to test a 3.5 milligal gravity anomaly outlined at the Red Dam prospect. A further 5 diamond drill holes are planned for the first quarter of 2007. A full description of the drill hole will be presented upon receipt of the assay results. The information in this report that relates to Exploration Results is based on information compiled by Mr. Gary Ferris, who is a Member of The Australasian Institute of Mining and Metallurgy. Mr. Ferris is the Managing Director of InterMet Resources and has sufficient relevant experience to qualify as a Competent Person as defined in the 2004 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Gary Ferris consents to the inclusion in the report of the matters based on his information in the form and context in which it appears. For further information contact: Mr Gary Ferris Managing Director InterMet Resources Tel: +61 8 8351 3388 Mob: 0423 259 488
ITT Price at posting:
0.0¢ Sentiment: Buy Disclosure: Held