Anyone able to confirm if the first stage is at max capacity? Only seems to get to 22MW, is it being staged or does the proposed 50MW include the second phase?
Week 48 Wrap: ASX flirts with 8,500pts; APRA declines mortgage loan easing; Trump's Bessent tied to Dem donor
History-making uranium sample grades and an imminent drill run. Infini Resources is poised to transform in 2025
ACW This biotech stock raised $11M in a risk-off environment. Its Alzheimer's drug could change the game