KEY 0.00% 0.1¢ key petroleum limited

Not sure if my maths on this are correct, but 40mcfd over 365...

  1. 886 Posts.
    Not sure if my maths on this are correct, but 40mcfd over 365 days = 11bcf. That means that in a year if they stuck to their pre-estimates before drilling, then the well would be exhausted in a year and a half. Or am I missing some form of mining knowledge that corrects that?
 
watchlist Created with Sketch. Add KEY (ASX) to my watchlist
(20min delay)
Last
0.1¢
Change
0.000(0.00%)
Mkt cap ! $2.262M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0
KEY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.