Hi Ducky,
My 2 cents:
The meeting notes reflect the accepted business plan and permitted activities. The mine was always scheduled to close post giant pit, in the absence of further economic resources near mine and rehab ramp up as mining reduces.
There has been a lot of drilling done at Kanmantoo, and the strong desire to secure a PHES may indicate the economic risk associated with this site. Hillgrove do not have underground experience, the recent wall collapse and copper grade levels probably tell a story.
- Forums
- ASX - By Stock
- KCCCC
Hi Ducky,My 2 cents:The meeting notes reflect the accepted...
-
-
- There are more pages in this discussion • 23 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add HGO (ASX) to my watchlist
(20min delay)
|
|||||
Last
5.8¢ |
Change
0.001(1.75%) |
Mkt cap ! $108.9M |
Open | High | Low | Value | Volume |
5.7¢ | 5.8¢ | 5.7¢ | $40.88K | 712.2K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
5 | 637837 | 5.7¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
5.8¢ | 431267 | 5 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 49767 | 0.080 |
2 | 230000 | 0.079 |
2 | 136415 | 0.078 |
1 | 97825 | 0.077 |
2 | 600000 | 0.075 |
Price($) | Vol. | No. |
---|---|---|
0.083 | 137770 | 2 |
0.084 | 288879 | 3 |
0.085 | 2009000 | 2 |
0.089 | 229500 | 1 |
0.090 | 76002 | 3 |
Last trade - 15.34pm 22/11/2024 (20 minute delay) ? |
HGO (ASX) Chart |