Hi Dockie,
The results in respect of a possible mine life extension were revealed in the June Quarterly Report issued on 31/07/2017 (page 7 onwards) and concluded:
"Hillgrove has approximated an Exploration Target at the Kanmantoo Copper Mine of between five and ten million tonnes with a target grade of between 1.7% and 2.2% Cu and 0.4g/t to 1.0g/t Au, containing approximately 80,000 tonnes to 160,000 tonnes of copper metal and 60,000 ozs to 120,000 ozs gold.
The size and grade of this underground Exploration Target suggests that a significant increase in mine life may be possible at Kanmantoo given that the zones are all within 250m of the existing in-pit haul road and they are all proximal to the existing low-cost processing plant."
Today's trading defies explanation (by me) but I think the buyers have acquired a reasonable parcel at a good average price.
- Forums
- ASX - By Stock
- Kanappa Extension
Hi Dockie, The results in respect of a possible mine life...
-
- There are more pages in this discussion • 3 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add HGO (ASX) to my watchlist
(20min delay)
|
|||||
Last
5.5¢ |
Change
-0.001(1.79%) |
Mkt cap ! $108.9M |
Open | High | Low | Value | Volume |
5.5¢ | 5.6¢ | 5.5¢ | $58.83K | 1.068M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
4 | 260464 | 5.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
5.6¢ | 1299265 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 49767 | 0.080 |
2 | 230000 | 0.079 |
2 | 136415 | 0.078 |
1 | 97825 | 0.077 |
2 | 600000 | 0.075 |
Price($) | Vol. | No. |
---|---|---|
0.083 | 137770 | 2 |
0.084 | 288879 | 3 |
0.085 | 2009000 | 2 |
0.089 | 229500 | 1 |
0.090 | 76002 | 3 |
Last trade - 15.57pm 26/11/2024 (20 minute delay) ? |
HGO (ASX) Chart |