"The battery system has to be designed to support the grid under islanded and grid- connected operation modes. This includes the operation of the island within frequency and voltage limits set out by the Technical Rules."
This was also a requirement of the Garden Island Microgrid Project. I think the term used was "seamless or bumpless transition between island and grid modes."
- Forums
- ASX - By Stock
- Kalbarri Town Talk
"The battery system has to be designed to support the grid under...
-
- There are more pages in this discussion • 2 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CCE (ASX) to my watchlist