The Interim report, which is due out tomorrow or Monday should say whether the draw-down of the DBP loan has occurred or not. So not long to wait.
Anyway, major progress has been made with these projects with the LNG tanks completed in both the Phillipines and Indonesia, this includes lining of the tanks by GTT, which was completed in 2015. This is confirmed on the GTT website.... at least it was the last time I had a look.
So this infrastructure is not just going to walk away. Sooner or later these projects will get completed, so major buying opportunity at current SP.
- Forums
- ASX - By Stock
- EWC
- Just great, sp testing 52 wk lows AGAIN.
Just great, sp testing 52 wk lows AGAIN., page-3
-
- There are more pages in this discussion • 2 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add EWC (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.0¢ |
Change
-0.003(13.0%) |
Mkt cap ! $29.24M |
Open | High | Low | Value | Volume |
2.1¢ | 2.1¢ | 1.9¢ | $15.13K | 757.5K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 1258505 | 1.8¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
2.1¢ | 77196 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 97 | 0.095 |
3 | 311964 | 0.094 |
1 | 300000 | 0.093 |
1 | 25000 | 0.092 |
3 | 54000 | 0.090 |
Price($) | Vol. | No. |
---|---|---|
0.096 | 20355 | 1 |
0.097 | 3101 | 1 |
0.099 | 60000 | 1 |
0.100 | 71326 | 2 |
0.105 | 220678 | 4 |
Last trade - 15.59pm 29/11/2024 (20 minute delay) ? |
EWC (ASX) Chart |