1/ppl back at work after the sumer break
2/ Placement soon at 21c?
3/ New pictures on website look better, but still WIP. roofs not on yet. Equipments and feedstock? How much money needed to buy these? Will everything ready in 2 months?
The 2 X 1mil XT today is a positive