@FutureTech Could be heading to Sudbury (closer than Nemaska in Shawinigan) with our 12% interest (control) in LPD, looks like they have all the chemicals etc. there. (oldish article).
Now that LPD have pulled the addition of the Li hydroxide circuit out of the hat for the pilot plant in Perth, from what I undersand/imagine a game changer would be if they announce that they can add another circuit or whatever to the plant to process spodumene directly, happy to be corrected on this one though, too technical for my brain! ;
http://www.sudburyminingsolutions.com/lithium-plant-on-the-horizon.html