holy f*ck - an article from MW not insinuating untruths and fraud.
Perhaps a bit more context about EWI loans to EWC and why they were made, and something about the "property and equipment" being the coldboxes etc that were paid for and all now on the ground, and the power expansion commissioned in [2009] might round out his article and give it a bit of balance. But all in all at least he didnt claim the compressors, coldboxes, generators, loading arms etc don't exist as he claimed last year. Maybe he read the annual report, or wrote his own article this time.
As for Mr Elliot, sharing all those wildly optimistic plans, without completing the sengkang project comes back and bites them on his butt.
The only thing he can really do it get that first LNG train producing.
- Forums
- ASX - By Stock
- jamaica bid
holy f*ck - an article from MW not insinuating untruths and...
-
-
- There are more pages in this discussion • 22 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add EWC (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $29.24M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 33037 | 2.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
2.3¢ | 535695 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 97 | 0.095 |
3 | 311964 | 0.094 |
1 | 300000 | 0.093 |
1 | 25000 | 0.092 |
3 | 54000 | 0.090 |
Price($) | Vol. | No. |
---|---|---|
0.096 | 20355 | 1 |
0.097 | 3101 | 1 |
0.099 | 60000 | 1 |
0.100 | 71326 | 2 |
0.105 | 220678 | 4 |
Last trade - 10.02am 04/12/2024 (20 minute delay) ? |
Featured News
EWC (ASX) Chart |
Day chart unavailable