JAK - ASX Company Announcement $gen0 THIS IS A PRIORITY ITEM 18 March 2003 Part 1/1 -------- JACKSON GOLD LIMITED --------------------
HOMEX - Perth ------------------------- Comm of drilling programs at Claypan Dam & Wallbrook Proj
The Company informs the market that significant drilling programs are commencing at the Claypan Dam and Wallbrook Projects this Monday, 24th March, 2003.
Both projects have potential to host significant additional gold resources and warrant continued aggressive exploration. The Company is targeting Kanowna Belle style mineralisation at Claypan Dam and large tonnage resources at Wallbrook.
CLAYPAN DAM
A Reverse Circulation (RC) drilling program of approximately 800 metres is planned to test for primary high grade mineralisation on the Kanowna Shear. Significant results intersected in the last drilling program which returned 5 metres at 6 grams per tonne Au from he bottom of hole, will be a focus for this drilling. Holes are planned to test the shear to depths of 150 metres.
The Company is targeting this drilling to define the source of the remobilized gold present in the supergene resources of Crossroads and the Kanowna Shear Prospects. The Company believes there is strong potential for the discovery of primary mineralization similar in style to the Kanowna Belle mine, located approximately 7 kilometres south east of Claypan Dam, adjacent to the Kanowna Shear.
WALLBROOK
An RC drilling campaign of approximately 2000 metres has been designed at Wallbrook primarily to increase drill coverage which will allow resource modelling of the Redbrook prospect. The company is confident that Redbrook will increase the total resource inventory for Wallbrook significantly.
M Gwynne EXECUTIVE DIRECTOR
ends - AAP
JAK Price at posting:
0.0¢ Sentiment: None Disclosure: Not Held