KEY 0.00% 0.1¢ key petroleum limited

its our fault.., page-20

  1. 6,736 Posts.
    lightbulb Created with Sketch. 122
    Awright, read the prospectus, Italy has been coming soon since April 2007.

    I'm largely ignoring Italy until we've been told that drilling has commenced. Even then any discoveries would take at least 4 years before production would start judging on the experience of Po Vally Energy (ASX: PVE).
 
watchlist Created with Sketch. Add KEY (ASX) to my watchlist
(20min delay)
Last
0.1¢
Change
0.000(0.00%)
Mkt cap ! $2.262M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0
KEY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.