Ok found GT NOrth and GT Next Results also
Add these to the estimates in my last post
If both these have only 30k each we have in excess off 500k resource
GTS (Next) Prospect
? 12m @ 1.65g/t
? 7m @ 2.80g/t
? 12m @ 1.43g/t
? 4m @ 3.30g/t
? 3m @ 6.01g/t (inc.1m @ 16.1g/t)
? 5m @ 3.15g/t
? 2m @ 6.86g/t
? 4m @ 1.26g/t
Golden Terrace North Prospect
? 1m @ 26.7g/t
? 5m @ 2.36g/t
? 6m @ 1.52g/t
? 3m @ 4.40g/t
? 6m @ 5.0g/t (inc. 1m @ 19.4g/t)
? 7m @ 3.5g/t (inc. 1m @ 11.1g/t)
? 1m @ 8.09g/t
? 5m @ 1.23g/t
From investor Presentation December
PRE has drilled Over 20,000 metres of drilling completed in 6 month phase of exploration since April capital injection.
"The 100% owned project has gold resource estimate
of 175,000oz and Co. is working toward a substantial increase"
-