88E 25.0% 0.3¢ 88 energy limited

Great comment! According to the drilking and testing schedule...

  1. 1 Posts.
    Great comment! According to the drilking and testing schedule MDT would be carried out while drilling the primary target, is that possible? Could that be part of LWD and have accurate results already?
 
watchlist Created with Sketch. Add 88E (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.