ARH's project key points:
• The Mineral Resource is very large
• The resource is a stones throw away from the coast
• Mining would be relatively simple
• The ore is magnetite which responds positively to magnetic separation
• The ore contains little phosphorous, alumina or other deleterious elements.
• Producing concentrates is not technologically difficult and high quality DR
pellets can be produced
• A gas pipeline is close to Southern block and is handy for pelletizing.
What more can i say?
- Forums
- ASX - By Stock
- iron ore project positives
ARH's project key points:• The Mineral Resource is very large•...
Featured News
Add SHN (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.1¢ |
Change
-0.001(4.55%) |
Mkt cap ! $20.63M |
Open | High | Low | Value | Volume |
1.0¢ | 1.1¢ | 1.0¢ | $24.57K | 2.289M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
10 | 2423998 | 1.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.1¢ | 30000 | 1 |
Last trade - 13.01pm 18/11/2024 (20 minute delay) ? |
Featured News
SHN (ASX) Chart |