Table 1 on page 3 of the PIOP JORC Mineral Resource Estimate has a grand total of 52.2 Fe %, this is on the low side as the high grade benchmark is 62 Fe% and the low grade benchmark that Fortescue has is 58 Fe %.
Is this a cause for concern, any comments would be appreciated.