B2,
Sorry, I got called away and didn't have time to fully explain what I meant.
The rig being used in the ARWON drill is still in place and has remained so since spud in early October. During the installation and testing of the BOP's, a mechanical fault was identified and the BOP's were removed and sent to Adelaide for repair. Once repaired, they will be returned, installed and tested, and drilling will recommence.
Cheers
Badfish