I notice that since April 2014, Indonesian foreign ownership rules for energy, oil and gas projects has changed. With the electrical power installation services now closed to foreign investment. Likewise Land drilling services and oil and gas support services.
How does this affect EWC's Indonesian power station and LNG plant. Does this mean at the end of 2022, EWC has to off sell these assets to a local?
- Forums
- ASX - By Stock
- Indonesian Foreign Ownership Rules
I notice that since April 2014, Indonesian foreign ownership...
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add EWC (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.9¢ |
Change
-0.001(5.00%) |
Mkt cap ! $29.24M |
Open | High | Low | Value | Volume |
2.1¢ | 2.2¢ | 1.8¢ | $39.37K | 1.942M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 997000 | 1.9¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
2.0¢ | 1849678 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 97 | 0.095 |
3 | 311964 | 0.094 |
1 | 300000 | 0.093 |
1 | 25000 | 0.092 |
3 | 54000 | 0.090 |
Price($) | Vol. | No. |
---|---|---|
0.096 | 20355 | 1 |
0.097 | 3101 | 1 |
0.099 | 60000 | 1 |
0.100 | 71326 | 2 |
0.105 | 220678 | 4 |
Last trade - 13.13pm 02/12/2024 (20 minute delay) ? |
Featured News
EWC (ASX) Chart |