Now I read that it is 120 Ha at the main target. So that makes 3Mt per vertical metre. If the other 5 targets make 40 Ha that gives us 4Mt per vertical metre. To 50m depth that's 200Mt. At 0.5% copper that's 1Mt of copper worth $8B to $9B without gold & moly credits.
Can't wait till next year's drilling. What if it's closer to 1% Cu? Wow!