They only allowed to run truck and dogs, no B Doubles allowed. Truck and Dogs if set up right could handle up to 32t. But semi tippers most likely only 28t. So assume 30t per trip, single trip per day. Only allowed to cart Monday to Friday and not public holidays. So allow per quarter 13 weeks at 5 days a week (65 days) (minus any public holidays) at 30t equals up to 1950t per truck movement per quarter, or 150t per truck per week.
Assign your own grades and number of trucks to that.
Mill, they have stated improved productivity, but the mill can operate 24/7, based on 156,000t per annum would require 3,000t per week to keep it constantly rotating. So would require 20 trucks per week from A1, however they also generating milling material from Union Hill, so this would reduce the requirement from the A1.
Like to know how they mill it, do they blend the Union Hill and A1 ore? Do they batch treat the two ore supplies separately so they can gain accurate grades from each mine. Don't think we have ever seen a really good breakdown of the grades from the two separate mines.
- Forums
- ASX - By Stock
- CTL
- In the interests of the Wider Community
In the interests of the Wider Community, page-32
-
- There are more pages in this discussion • 51 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CTL (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.0¢ |
Change
0.000(0.00%) |
Mkt cap ! n/a |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
CTL (ASX) Chart |
Day chart unavailable