OKU 5.26% 15.0¢ oklo resources limited

You may be right about the spike being done but it seems...

  1. 835 Posts.
    lightbulb Created with Sketch. 9
    You may be right about the spike being done but it seems premature to say follow up drills are not as hot insofar very few results are know and the recent drilling update says the following:

    KOUROUFING PROJECT
    ► Infill and step-out drilling is targeting extensions to previously reported significant shallow gold intersections that included 34m at 1.12g/t gold from 2m, 40m at 1.02g/t gold from surface and 34m at 1.06g/t gold from surface1.
    ► 5,084m of aircore (AC) drilling completed in 160 holes with assays pending.
    ► 177m of diamond drilling (DD) completed in 1 hole with assays pending.
    ► The DD rig has now converted to reverse circulation (RC) drilling with the first of 7 planned holes for 1,100 metres now underway.
    ► 22,488 m of auger drilling completed in 1,548 holes with assays pending from 1,324 holes.

    DANDOKO PROJECT
    ► Line clearing underway to allow access for a multipurpose rig for follow up AC, RC and DD drilling at Seko, Dabia and Sory and other targets along the 12km gold corridor.
    ► The drilling programs will include following up existing RC intersections at Sory, 1.5km to the south of Seko, that included 44m at 1.37 g/t gold from 33m and AC intersections at Dabia, 1.5km north of Seko, which included 25m @ 2.50 g/t gold from 65m.2
    ► Drilling contract awarded, with work expected to start in two weeks.

    KOSSAYA AND SARI PROJECTS
    ► Four auger drill rigs are currently in operation at the Sari and Kossaya projects, with 8,950m of drilling completed to date in 639 holes, all assays are pending and drilling is continuing.
 
watchlist Created with Sketch. Add OKU (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.