But what has really changed in the latest report from I-99 the sampling that is shown from the home wells are in line with previous tests results. I for one will be waiting for the lysimeter results before I throw a wobbly.as they will be in close proximity to the area being tested and are any of the home wells close by. One of the home wells had improved in the previous report. Gilt Edge has been 4 years in the making and I-99 started in the middle of August testing a system that has never been done before. The USEPA have basically stated that any other treatment measure will have to meet the standards VTI has set in respect of the materials that have to be removed. Section 317 fill is a part of I-99 recently assest and away from the main Buttress/bufication area VTI are working on.The decision to remove this 317 fill and mix it with lime has nothing to do with VTI. I am going to the AGM and have had my say before, i`m still holding and buying when i can.
Regards Madprof.
VTI Price at posting:
0.0¢ Sentiment: None Disclosure: Not Held