SGL ricegrowers limited

Slide 22 of the SGL AGM Presentation in November 2006 projects...

Currently unlisted. Proposed listing date: MONDAY, 8 APRIL 2019 11:00AM ##
  1. 1,550 Posts.
    lightbulb Created with Sketch. 5
    Slide 22 of the SGL AGM Presentation in November 2006 projects that gas production at the Camden Gas Project (50% SGL) will rise from an estimated 13 Tj/day as at Dec 06 to an estimated 26 Tj/day as at Dec 07. That represents a 100% rise in montly revenue over 12 months. Not many business generating that type of rise in revenue. A lot of the rise should flow through to the EBITDA line.

    Regards

    SP
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.