As a miner I would be stoked to have 6% tailings to supplement mine feed straight to the Isamill. The higher grade mine ore will be the priority as it will be the money maker, but how easy is it to feed tailings. The tailings are already blasted, hauled and crushed, super low input costs, money for jam.
The tailings will be a fantastic blend for the high grade ore. Also they are primarily fresh rock tailings, even better. And mill through puts will be stellar. HRR may have to slow the circuit when the super high grade goes through to keep the circuit stable.
Should be able to achieve a very stable circuit with the consistent tailings feed as it will smooth out the extremely variable high grades coming from the mine.
Next on the awesome list for this project is the resource expanse that will most likely come when the exploration drilling goes underground from the lower levels.
71c4
HRR Price at posting:
7.5¢ Sentiment: Hold Disclosure: Held